ENERGY & CAPACITY OPTIMISATION

Make more of the power you already have.

Find avoidable energy costs, unused capacity and opportunities to reduce peaks. We review your electricity contract and real site data, then show what is worth changing.

For factories, logistics sites, industrial parks and large electricity users. No new hardware required for the first review.

CAPACITY REVIEWILLUSTRATIVE EXAMPLE

What does your power reservation actually cover?

Reserved capacity800 kW
Observed site peak520 kW
↗
280 kWDifference worth investigating

Sample numbers, not a customer result. The difference is not guaranteed savings, transferable capacity or safe operating headroom.

THE OPPORTUNITY

You may have more options than your electricity bill shows.

Industrial electricity costs depend on more than total consumption. Contract terms, peak demand, production schedules, on-site generation and storage all affect what is economical.

GridPass turns that information into an engineering decision: what to change now, what to model first and what must stay protected.

See how we protect industrial operations

WHAT WE REVIEW

Six ways to improve your site's energy economics.

Start with existing data. Build a business case before investing in new meters, software or control equipment.

01CONTRACT & CAPACITY

Right-size reserved power

Compare contracted capacity, measured peaks, operating reserve and future growth. Find out whether changing the reservation is worth investigating under your local tariff.

02PEAK-DEMAND COSTS

Control expensive peaks

Identify the intervals that set demand charges or trigger penalties. Model how approved equipment schedules, storage or controls could reduce those peaks.

03ENERGY INTELLIGENCE

Find waste in existing data

Review utility bills, meter exports and existing energy-management reports to uncover abnormal baseload, inefficient operating periods and avoidable consumption.

04BATTERY, SOLAR & EV

Make site assets work together

Compare options for solar self-consumption, storage dispatch and vehicle charging against electricity prices, capacity limits and equipment constraints.

05INDUSTRIAL LOADS

Shift what can safely move

Assess compressors, refrigeration, HVAC, pumps and other flexible loads while excluding protected production, safety systems and unapproved equipment.

06GROWTH & FLEXIBILITY

Use capacity more effectively

Model additional equipment or site expansion within existing connection limits. Where eligible, assess demand-response or aggregator opportunities separately.

NO REPLACEMENT DASHBOARD REQUIRED

Already measuring energy? Use that data first.

We can start with the reports or exports from your existing meters, EMS, SCADA or building-management system. GridPass adds capacity, tariff and flexibility analysis on top.

Direct integrations and automated control are optional engineering work, not prerequisites for an initial assessment.

Explore site load balancing

Useful inputs for a first study

  • 01 Electricity bills and tariff or contract terms
  • 02 Meter data, ideally 12 months at 15-minute intervals
  • 03 Contracted power and connection constraints
  • 04 Production schedule and critical loads
  • 05 PV, battery, charging or expansion plans, if relevant

Missing data? Send what is available. The first review identifies the gaps.

THE OFFER

Start with a review. Pay only for justified next steps.

No promised percentage savings and no unnecessary hardware purchase. We make the technical and commercial case first.

01

Free first review

Share your site, current power reservation and any bill or interval-data export you have. We identify which opportunities merit a closer look.

No installation required
02

Detailed capacity study

We validate data, compare tariff and operational scenarios, calculate constraints and document the assumptions behind each option.

Scoped engineering work
03

Optional pilot and optimisation

Where justified, we plan integration with approved site equipment or an existing EMS. Physical control requires a separate commissioning and safety scope.

Only after site approval

A USEFUL FIRST DELIVERABLE

A site-specific action plan, not another dashboard.

  • Reserved capacity and peak-demand assessment
  • Cost-saving scenarios with assumptions
  • Protected loads and practical constraints
  • Prioritised next steps, with or without integration

COMMON QUESTIONS

Clear boundaries. Useful answers.

We already use an energy management system. Do we need another one?

No. The first study starts with authorised meter exports, bills and reports from the systems you already have. Any live data connection or control integration is separately assessed.

Can you reduce our contracted capacity and electricity bill?

Possibly, but not automatically. We check the tariff, contract, observed demand, operating reserve, exceptional peaks and planned growth before suggesting a capacity change. Some tariffs do not charge for reserved capacity in the same way.

Can we sell unused connection capacity?

Unused reserved capacity is not automatically transferable or saleable. We can assess whether controllable load or storage might qualify for an authorised flexibility or demand-response programme.

Will GridPass turn off factory equipment?

Not during a study. Any later control is limited to explicitly approved assets, with agreed safeguards, permissions and a staged site test. Production and safety-critical loads remain protected.

Start a conversation

Request a free energy & capacity review

Share the site details you have. We will reply with a clear next step.

Available options depend on your location, site demand and network terms.

We use these details to reply to your request.