We are looking for first pilot sites in Europe

Get the power your site needs. Stay within the grid limit.

GridPass helps large electricity users assess flexible connection terms, plan approved site controls and record each response. For factories and data centres. A network operator decides whether capacity is available and on what terms.

Illustrative large-load site · grid event16:00
Software illustration: an import limit is applied. The controller uses battery capacity first, then approved flexible site loads, then operator-owned opt-in workloads. Protected process and third-party tenant loads remain untouched. Grid operator Limit 12 MW Grid Grid connection 18.4 MW now Limit 20 MW No limit now Edge controller watching every second Battery 80% standby Flexible site loads normal Opt-in workload inferencetraining opt-in work: full setting Protected loads Not touched process or tenant loads
Grid draw18.4 MW
Full 20 MW available

Illustrative software model. Network capacity, connection terms and site permissions are set outside GridPass.

GridPass services

Choose the route that fits your site

How it works

1. Size

We run a year of your site load against the grid operator's terms. You see how much flexible capacity you can sign and what battery you need.

2. Control

Use the battery first, then approved flexible site loads, then operator-owned opt-in workloads. Protected process loads and third-party tenant loads are never curtailed.

3. Prove

Record each limit event against site measurements. A deployed system must agree the data, access and record format with the site and operator.

Who it is for

Grid operators

Review a proposed site response to flexible connection limits and its event evidence.

Data-centre teams

Assess battery and approved workload response while protecting tenant-owned loads.

Factory teams

Protect process lines and review candidate flexibility such as compressed air, chillers and fleet charging.

Investors

See a focused control product for large loads seeking flexible grid capacity, with a path from site assessment to verified operation.

See the load-balancing model

Try a software simulation for an AI data centre or a factory. Lower the import ceiling, raise it to allow optional battery charging, and inspect the site response.

Contact

Talk to us

We are looking for pilot sites, and for grid operators who want to talk. Write to us or book a call.

Andrii ShylenkoCo-founder · controls and embedded systemsandrii@gridpass.eu
Simon BarcziCo-founder · energy markets and grid economicssimon@gridpass.eu

Book a 30-minute call

We use your details only to reply to you. See our privacy notice.

Regulatory path

Flexible connection control and evidence.

Article 6a of Directive (EU) 2024/1711 sets a framework for flexible connection agreements where capacity is limited. The directive requires a certified power control system for a system user connecting through such an agreement. GridPass is not certified. Certification is planned work.

Article 6a requires a certified power control system for users connecting through a flexible agreement. GridPass is working towards this requirement. Directive (EU) 2024/1711, Article 6a ↗